• architecture office berlin
    TRIFT 37-38

    Berlin-Reinickendorf

    Restoration, restructurization and change of use for existing factory buildings LP 1-4

    The three workshop buildings at Triftstraße 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer “Wilhelminenhof AG” to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.

    Construction period: 2011-2012
    Plot area: 39,800 m²
    Rental space: ca. 17,100 m²
    Number of rental items: 33
    Construction cost: ca. 6,000.000 Euro

    A project for psg Berlin

  • architect berlin
    TRIFT 37-38

    Berlin-Reinickendorf

    Restoration, restructurization and change of use for existing factory buildings LP 1-4

    The three workshop buildings at Triftstraße 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer “Wilhelminenhof AG” to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.

    Construction period: 2011-2012
    Plot area: 39,800 m²
    Rental space: ca. 17,100 m²
    Number of rental items: 33
    Construction cost: ca. 6,000.000 Euro

    A project for psg Berlin

  • architect beate kalus
    TRIFT 37-38

    Berlin-Reinickendorf

    Restoration, restructurization and change of use for existing factory buildings LP 1-4

    The three workshop buildings at Triftstraße 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer “Wilhelminenhof AG” to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.

    Construction period: 2011-2012
    Plot area: 39,800 m²
    Rental space: ca. 17,100 m²
    Number of rental items: 33
    Construction cost: ca. 6,000.000 Euro

    A project for psg Berlin

  • architect beate kalus berlin
    TRIFT 37-38

    Berlin-Reinickendorf

    Restoration, restructurization and change of use for existing factory buildings LP 1-4

    The three workshop buildings at Triftstraße 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer “Wilhelminenhof AG” to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.

    Construction period: 2011-2012
    Plot area: 39,800 m²
    Rental space: ca. 17,100 m²
    Number of rental items: 33
    Construction cost: ca. 6,000.000 Euro

    A project for psg Berlin