Entrée Schlossstrasse, Berlin-Steglitz
Construction of retail pavilions LP 1-9
The area, which is located underneath an urban motorway bridge, has been fitted with five new pavilions for retail and service businesses. Part of the underlying concept was to give each of the different sized boxes the same outer appearance, facade design and height. The design of the area also included the surrounding space, lighting concept and seating spaces.
Construction period: 2008-2010 in 2 phases
Plot size: ca. 3,806 m²
Rental space: ca. 1,701 m²
Construction cost: ca. 2,500.000 Euro
A project for psg Berlin