{"id":169,"date":"2014-12-25T01:37:06","date_gmt":"2014-12-24T23:37:06","guid":{"rendered":"https:\/\/plusbk-architektur.de\/en\/?p=169"},"modified":"2015-02-07T13:07:52","modified_gmt":"2015-02-07T12:07:52","slug":"trift-37-38-2","status":"publish","type":"post","link":"https:\/\/plusbk-architektur.de\/en\/projects\/trift-37-38-2\/","title":{"rendered":"TRIFT 37-38"},"content":{"rendered":"<div id=\"metaslider-id-73\" style=\"width: 100%;\" class=\"ml-slider-3-90-0 ml-slider-pro-2-5 metaslider metaslider-responsive metaslider-73 ml-slider ms-theme-default\" role=\"region\" aria-roledescription=\"Slideshow\" aria-label=\"TRIFT\">\n    <div id=\"metaslider_container_73\">\n        <ul id='metaslider_73' class='rslides'>\n            <li aria-roledescription='slide' aria-labelledby='slide-0'><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/plusbk-architektur.de\/en\/wp-content\/uploads\/sites\/3\/2015\/01\/trift_01.jpg\" height=\"620\" width=\"1100\" alt=\"architecture office berlin\" class=\"slider-73 slide-74\" title=\"TRIFT 37-38\" \/><div class=\"projekte caption-wrap\"><div class=\"title\">TRIFT 37-38<\/div><div class=\"caption\"><p>Berlin-Reinickendorf<\/p>\n<p>Restoration, restructurization and change of use for existing factory buildings LP 1-4<\/p>\n<p>The three workshop buildings at Triftstra\u00dfe 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer &#8220;Wilhelminenhof AG&#8221; to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.<\/p>\n<p>Construction period: 2011-2012<br \/>\nPlot area: 39,800 m\u00b2<br \/>\nRental space: ca. 17,100 m\u00b2<br \/>\nNumber of rental items: 33<br \/>\nConstruction cost: ca. 6,000.000 Euro<\/p>\n<p>A project for psg Berlin<\/p>\n<\/div><\/div><\/li>\n            <li style='display: none;' aria-roledescription='slide' aria-labelledby='slide-1'><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/plusbk-architektur.de\/en\/wp-content\/uploads\/sites\/3\/2015\/01\/trift_02.jpg\" height=\"620\" width=\"1100\" alt=\"architect berlin\" class=\"slider-73 slide-75\" title=\"TRIFT 37-38\" \/><div class=\"projekte caption-wrap\"><div class=\"title\">TRIFT 37-38<\/div><div class=\"caption\"><p>Berlin-Reinickendorf<\/p>\n<p>Restoration, restructurization and change of use for existing factory buildings LP 1-4<\/p>\n<p>The three workshop buildings at Triftstra\u00dfe 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer &#8220;Wilhelminenhof AG&#8221; to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.<\/p>\n<p>Construction period: 2011-2012<br \/>\nPlot area: 39,800 m\u00b2<br \/>\nRental space: ca. 17,100 m\u00b2<br \/>\nNumber of rental items: 33<br \/>\nConstruction cost: ca. 6,000.000 Euro<\/p>\n<p>A project for psg Berlin<\/p>\n<\/div><\/div><\/li>\n            <li style='display: none;' aria-roledescription='slide' aria-labelledby='slide-2'><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/plusbk-architektur.de\/en\/wp-content\/uploads\/sites\/3\/2015\/01\/trift_03.jpg\" height=\"620\" width=\"1100\" alt=\"architect beate kalus\" class=\"slider-73 slide-76\" title=\"TRIFT 37-38\" \/><div class=\"projekte caption-wrap\"><div class=\"title\">TRIFT 37-38<\/div><div class=\"caption\"><p>Berlin-Reinickendorf<\/p>\n<p>Restoration, restructurization and change of use for existing factory buildings LP 1-4<\/p>\n<p>The three workshop buildings at Triftstra\u00dfe 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer &#8220;Wilhelminenhof AG&#8221; to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.<\/p>\n<p>Construction period: 2011-2012<br \/>\nPlot area: 39,800 m\u00b2<br \/>\nRental space: ca. 17,100 m\u00b2<br \/>\nNumber of rental items: 33<br \/>\nConstruction cost: ca. 6,000.000 Euro<\/p>\n<p>A project for psg Berlin<\/p>\n<\/div><\/div><\/li>\n            <li style='display: none;' aria-roledescription='slide' aria-labelledby='slide-3'><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/plusbk-architektur.de\/en\/wp-content\/uploads\/sites\/3\/2015\/01\/trift_04.jpg\" height=\"620\" width=\"1100\" alt=\"architect beate kalus berlin\" class=\"slider-73 slide-77\" title=\"TRIFT 37-38\" \/><div class=\"projekte caption-wrap\"><div class=\"title\">TRIFT 37-38<\/div><div class=\"caption\"><p>Berlin-Reinickendorf<\/p>\n<p>Restoration, restructurization and change of use for existing factory buildings LP 1-4<\/p>\n<p>The three workshop buildings at Triftstra\u00dfe 37-38 constituted the production and storage facilities built in 1978 for cable manufacturer &#8220;Wilhelminenhof AG&#8221; to produce cables and industrial wires. The object had been abandoned in October 2006. Apart from a reconstruction of essential building structures the focus of this project lay in a reformation into several smaller storage, production, service and trading spaces. The static construction, the structure of the facade as well as the cubature of the halls remained unchanged.<\/p>\n<p>Construction period: 2011-2012<br \/>\nPlot area: 39,800 m\u00b2<br \/>\nRental space: ca. 17,100 m\u00b2<br \/>\nNumber of rental items: 33<br \/>\nConstruction cost: ca. 6,000.000 Euro<\/p>\n<p>A project for psg Berlin<\/p>\n<\/div><\/div><\/li>\n        <\/ul>\n        \n    <\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/posts\/169"}],"collection":[{"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/comments?post=169"}],"version-history":[{"count":1,"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/posts\/169\/revisions"}],"predecessor-version":[{"id":170,"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/posts\/169\/revisions\/170"}],"wp:attachment":[{"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/media?parent=169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/categories?post=169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plusbk-architektur.de\/en\/wp-json\/wp\/v2\/tags?post=169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}