Mittelheide, “Märchenviertel” – Berlin-Köpenick
Full restoration, restructurization and modernization of a landmark housing area in Berlin-Köpenick.
Project steering and project management for a private investor.
The 2 and 3 story buildings of the landmark site had been constructed between 1927 and 1929. Some buildings have been reconstructed in 1952-1956 after their demolition in WWII. The buildings are to be modernized and sold as condominiums. The planned thorough construction is aimed at providing a maximum of living quality. The generous green space remains in tact and will be redesigned on demand, observing best possible site preservation.
Construction period for MH 1: 2013-2015
Planned floor space including attic apartments: ca. 2,000 m²
Construction cost: ca. 16,000.000 €
Planned living quarters: 100 existing apartments and 30 new attic flats